Project Description
Galvin Engineering was an important member in the project for Abbotsford Private Hospital situated in West Leederville. This project involved the demolition of the previous mental hospital and in turn the construction of a new mental health facility. The expansion allowed for a further 47 beds to be added, increasing the hospital’s capacity to bed 77 people.
Galvin Engineering incorporated products that were tailored to this mental health industry's unique needs. Our showers, basins, taps, and toilets used in this expansion are equipped with anti-ligature features that mitigate the risk of self-harm by reducing the likelihood of ligature attachment.
Key Data
Location: 61-69 Cambridge Street, West Leederville WA 6007 | Architect: Meyer Shircore |
Project start: January 2019 | Builder: Badge Constructions |
Project completion: December 2022 | Hydraulic: Forth Consulting |
Plumbing Contractor: Triple T Plumbing and Civil | Value of Overall Project: $19 million |
Products Installed
- GalvinCare® CP-BS Mental Health Anti-Ligature Wall Outlet 15 FI
- Wallgate Anti-Ligature brushed SS Ceiling Mounted Shower with Removable Plate & Anti-Ligature Screw
- Vandal Resistant Dual Flush Push Button Assembly with Polished Stainless Steel Plate
- CliniLever® CP-BS Hospital Wall Mixing Set Type 56 Fixed 150 J/V
- Ezy-Wash® Stainless Steel Slophopper Hose/Spring Assembly with Heavy Duty Hand Trigger Spray
- Safe-Cell® CP-BS Prison Ezy-Grip Wall Top Assembly Complete Cold C/D
- Safe-Cell® CP-BS Prison Ezy-Grip Wall Top Assembly Complete Hot C/D
- Flowmatic® Cell Call Activated Ass 24v AC for Flushing Rim Sink with SS Face Plate
- GalvinCare® CP-BS Mental Health Anti-Ligature Paddle Handle WTA Comp 1/4 Turn C/D Cold
- GalvinCare® CP-BS Mental Health Anti-Ligature Paddle Handle WTA Comp 1/4 Turn C/D Hot
- Pneumatic Activated Concealed Dual Flush Cistern 3/4.5Ltr Cistern Only
- GalvinCare® Mental Health Grab Rail