Project Description
Bunbury Regional Prison underwent an expansion providing space for an additional 160 detainees, increasing the facilities capacity by 50%. The development involved the construction of a new educational facility, renovation of the dining and kitchen areas, and modifications to the service and security infrastructure.
Galvin Engineering was the supplier of choice due to our extensive experience in the correctional industry. To ensure that inmates and staff are kept safe, the tapware and sanitaryware design had to be appropriate for high-risk locations. To reduce the risk of self-harm and harm to others, many of our anti-ligature and anti-vandal products were incorporated into this project.
Key Data
Location: Centenary Road, Bunbury WA 6230 | Architect: Cox Architecture |
Project start: January 2019 | Builder: ADCO Constructions |
Project completion: August 2019 | Hydraulic: Jacobs |
Plumbing Contractor: Andel Plumbing | Value of Overall Project: $16 million |
Products Installed
- Safe-Cell® CP-BS Prison Cistern Push Button Assembly
- GalvinCare® CP-BS Mental Health Anti-Ligature Basin Outlet High Flow 15MI X 300mm Long
- GalvinCare® CP-BS Prison Multi-Grip Wall Top Assembly - Extended 300 Complete Hot C/D
- Safe-Cell® CP-BS Prison Multi-Grip Wall Top Assembly - Extended 300 Complete Cold C/D
- Safe-Cell® Polished SS316 (CRR) Prison Floor Drain Round 100x80 BSP
- CI Floor Drain Balcony Body Assembly 50PVC/HDPE