Project Description

In 2019-2020, Hollywood Private Hospital underwent an expansion that added 31 beds to its capacity, bringing the total number of beds to 101. The goal of this project was to construct a day procedure unit for neurostimulation and five group therapy rooms within the Mental Health unit. 

As the project was for a Mental Health unit, many of the Galvin Engineering products implemented had suitable features for this industry. This includes our anti-ligature and anti-vandal products like showers, basins, taps and toilets which have been designed with properties that reduce the risk of ligature attachment and in turn minimise the risk of patient's committing self-harm.

 


 

Key Data

Location: Monash Ave, Nedlands WA 6009 Architect: Silver Thomas Hanley (Perth)
Project start: November 2019 Builder: Georgiou Group
Project completion: April 2020 Hydraulic: Jabobs
Plumbing Contractor: ACE+ Value of Overall Project: $11.3 million

 


 

Products Installed